Case Study 2


About Us

Mould: 13 sets

Manufacturing cycle: 4 weeks for first mold trial
1 project manager; 2 project engineers; 4 mold design engineers; more than 20 manufacturing technicians jointly completed 13 sets of molds.


According to customer's 2D/3D inspection

-Product's appearance requirements, size, function
-Is there any interference in assembly gap? Is gap reasonable?
-Does product have a draft angle and is it sufficient?
-Check thickness of glue position of product, whether there is thin glue, which makes it impossible to fill glue, or glue position is thick, which causes product to shrink
-Is product difficult to demould?
Mould Design

Go To Top